One
of the major factors leading to a successful
project is the careful coordination of details
of the electro-mechanical installation with
architectural, Structural requirements. Crown
home pride itself on its frequent coordination
sessions – made all the more easy as the related
departments are integrated to the consultancy.
To
complete a project successfully, Crown Home
undertakes five major steps :
-
Carrying out a
filed investigations to assess local
conditions and to determine the local
availability of equipment, materials and
organization foe services and maintenance.
-
Preparation of
a preliminary report, to include estimates
of basic requirements and the choice of
systems concepts.
-
Preparation of
a fundamental Design, including economic
comparison of alternatives, description of
selected systems, sizing of major
components, outline specification and budget
estimates.
-
Preparation of
final Design and Tender documents including
constriction drawings, technical
spoliations, bill of quantities and cost
estimates then, subsequently Tender
Evaluations.
-
During
Construction the project team remains
responsible for the approval of the
contractor’s shop drawings, equipment
selection, and general follow-up on the
construction site until commissioning and
handing over.
|
|
|